Project Period: August – December 2017
Project Location: Salinas Victoria, Nuevo Leon, Mexico
Project scope: Tank, Pipes, and Roll up doors
Project Description:
• Roll up Doors install
• Tank (100t) Install
• Equipment Install
• Pipe install
• Tank and pipes Insulation