top of page
그림53.jpg

MCNS SKC
POLYURETHANES

Project Period: August – December 2017

Project Location: Salinas Victoria, Nuevo Leon, Mexico

Project scope: Tank, Pipes, and Roll up doors

Project Description:

• Roll up Doors install

• Tank (100t) Install

• Equipment Install

• Pipe install

• Tank and pipes Insulation

back_02_edited.png
bottom of page